|
CURRENT NEWS
2012-01-18
Puma drills 24.6 meters of 100 g/t Silver, 1.4% Lead and 1.3% Zinc at Dante Lens, New Brunswick
Download
430.25 Kb
2012-01-12
239 g/t Silver and 1.9% Lead over 6.3 meters at surface at Dante Lens, New Brunswick
Download
75.30 Kb
2011-12-21
Two additional mineralized lenses discovered at Nicholas-Denys, New Brunswick
Download
107.73 Kb
|
FEATURED PROJECT
NICHOLAS-DENYS, New Brunswick
.jpg)
Silver Deposits and showings at Nicholas-Denys Property
The Nicholas-Denys property is located only 20 kilometres north of Bathurst and is part of the Bathurst Mining Camp of northern New Brunswick. The property is accessible by road all year round and is intersected by a power line. The Nicholas-Denys property is 6,750 hectares and is part of Puma’s 10,476 hectare holdings which include the Turgeon Copper Project.
The geophysical surveys added with compilation of current and previous works has confirmed the presence of two structures parallels to the Rocky-Brook-Millstream Fault. The Rocky-Brook-Millstream Fault is a primary control for the mineralization found in the main Haché, Shaft, Henry, PineTree, and Great Northern lenses. All three structures together hosts 16 promising silver deposits and showings over a strike length of 10 kilometers. More about Nicholas-Denys...
PUMA'S MEDIA PAGE
.jpg)
|
ACTIVE PROJECTS
NICHOLAS-DENYS (AG) New Brunswick
.jpg)
TURGEON (CU) New Brunswick
.jpg)
LITTLE STULL LAKE (AU) Manitoba
.jpg)
STOCK QUOTE
Symbol: PUM.V
Price: 0.29 $
Change: +0.005 $
Open: 0.29 $
High: 0.29 $
Low: 0.29 $
Volume: 1000
![[Most Recent Quotes from www.kitco.com]](http://www.kitconet.com/charts/metals/silver/tny_ag_en_caoz_2.gif)
More
|